
Due to the presence of unique corporate cultures in all industrial facilities and businesses, the process analysis’, quality supervisions and project managements of these facilities may require a different approach from other organizations.
Within the scope of independent inspection activities, 3D InCertA carries out projects for various industrial facilities, including project assessments, safety inspections, construction process control and performance evaluations which may require expert opinions.
The goal of all these activities is to ensure the attainment of the desired quality. In this context, some of the project management services we provide include:
Manufacturer and Assembler Quality System Audits
Work Progress Process Control
Field Inspections
Manufacturing Control
Design Calculation Verification
ITP Preparation
Material Control
Witnessing of Performance Tests (Load tests, hydrostatic tests, etc.)
Witnessing of Commissioning Tests
Checking the Quality Records
Shipment Inspections
Some of the industrial areas where we carry out the project surveillance services mentioned above include:
Natural Gas Power Plants
Bridges
Space Roofs
Spherical and Cylindrical Tanks
Steel Constructions
Airports
Ports
Cranes
Railways and Stations
Chemical Plants
Crude Oil Facilities
Water Treatment Plants
Nuclear Power Plants
Steam Generators
Gas Turbines
Wind Power Plants
Hydraulic Structures
Pressure Vessels
Valves
Pipes
Within the scope of independent inspection activities, 3D InCertA carries out projects for various industrial facilities, including project assessments, safety inspections, construction process control and performance evaluations which may require expert opinions.
The goal of all these activities is to ensure the attainment of the desired quality. In this context, some of the project management services we provide include:
Manufacturer and Assembler Quality System Audits
Work Progress Process Control
Field Inspections
Manufacturing Control
Design Calculation Verification
ITP Preparation
Material Control
Witnessing of Performance Tests (Load tests, hydrostatic tests, etc.)
Witnessing of Commissioning Tests
Checking the Quality Records
Shipment Inspections
Some of the industrial areas where we carry out the project surveillance services mentioned above include:
Natural Gas Power Plants
Bridges
Space Roofs
Spherical and Cylindrical Tanks
Steel Constructions
Airports
Ports
Cranes
Railways and Stations
Chemical Plants
Crude Oil Facilities
Water Treatment Plants
Nuclear Power Plants
Steam Generators
Gas Turbines
Wind Power Plants
Hydraulic Structures
Pressure Vessels
Valves
Pipes
